Embedded Generation

Embedded Generation

Embedded Generation

In her bid to contribute to the nation’s vision of attaining 40,000 MW of power generation by the year 2020 and ensure at least 60% of the population have access to electricity, GEC offers embedded power solutions to client clusters in collaboration with the distribution companies. This is made possible through optimizing a mix of power sources such as natural gas, liquefied petroleum gas, diesel and solar power.  As an Embedded Generator Licensee, GEC (as GLT) is currently developing a 30 MW cogeneration power plant in Ikeja, Lagos State.

© 2025: Geogrid Energy Company | Powered by TECHNOCONTRACT